Skip to content
Salvation Army Kroc Community Center

Salvation Army Kroc Community Center

Challenge

  • First design/build facility for Salvation Army
  • Required different solutions to maintain varying environments in one building

Solution

  • Control Logic of Michigan installed an Automated Logic DDC temperature control system
  • A snowmelt system
  • Geo-thermal bore field (150 vertical bores)
  • Geo-thermal heat pump system with 49 heat pumps
  • 8-energy recovery units
  • Hi-efficiency boilers
  • Radiant floor heat
  • Dehumidification unit for the indoor pool area

A Closer Look

88,000 sq. ft., multiuse building including; indoor pool, exercise facilities, chapel, banquet facility, indoor running track, and offices.