Salvation Army Kroc Community Center
Challenge
- First design/build facility for Salvation Army
- Required different solutions to maintain varying environments in one building
Solution
- Control Logic of Michigan installed an Automated Logic DDC temperature control system
- A snowmelt system
- Geo-thermal bore field (150 vertical bores)
- Geo-thermal heat pump system with 49 heat pumps
- 8-energy recovery units
- Hi-efficiency boilers
- Radiant floor heat
- Dehumidification unit for the indoor pool area
A Closer Look
88,000 sq. ft., multiuse building including; indoor pool, exercise facilities, chapel, banquet facility, indoor running track, and offices.