Large Manufacturing Facility

Challenge

The most significant projects have been a chiller plant and a large campus including offices, distribution, and a production facility. The campus building contains approximately 250,000 sq. ft. under roof.

Solution

The chiller plant includes:

  • 5,000 tons of cooling
  • Extensive BIM use allowing us to pre-fabricate the main piping systems

The campus building includes:

  • 2,500 tons of cooling
  • 6 boilers serving a hot water system
  • 12 air handling units with the largest being over 60,000 cfm each
  • An extensive snow melt system
  • Humidification systems
  • Associated ductwork and piping systems

A Closer Look

We also worked closely with the company to design and install the building automation system for the campus facility.